|
|
 |
| Martin Marrietta Materials |
 |
Fabrication and installation of a 50 ft. diameter settling tank for aggregate slurry.
The project consisted of the fabrication of the settling tank, pump house, and all associated piping. Installation and commissioning of the electrical system, pumps, agitators and associated equipment. |
 |
|
 |
|